PQ Corporation, Bank Quay, Warrington

This project included repairs, hole filling, and the coating of cladding, gutters and downspouts in a striking blue finish to provide long-lasting protection and a refreshed modern appearance.

Maintaining the external envelope of an industrial facility is essential for preserving asset value, protecting operational performance, and presenting a professional image. When PQ Corporation required a long-term solution to improve the appearance and protection of its building at Bank Quay, Warrington, Cladding Coatings Ltd was appointed to deliver a comprehensive cladding refurbishment project across two elevations.

The objective was to restore the weathered external cladding, address existing defects, and provide a durable coating system backed by a 15-year warranty. As part of the project, all associated rainwater goods, including gutters and downspouts, were incorporated into the refurbishment programme to ensure a consistent finish and complete external transformation.

The selected finish was a vibrant blue colour scheme, helping to modernise the building’s appearance while providing long-term protection against the effects of weathering, corrosion, and environmental exposure.

Cladding Refurbishment Warrington 2

The Project Challenge

Industrial and commercial buildings are exposed to harsh environmental conditions throughout their lifespan. Over time, external cladding can become faded, discoloured, and damaged through constant exposure to UV radiation, rain, fluctuating temperatures, and airborne contaminants.

At the PQ Corporation facility, sections of the cladding exhibited signs of age-related deterioration, including redundant fixing holes and surface imperfections that detracted from the overall appearance of the building. The existing finish no longer reflected the professional standards expected of a major industrial operation, creating the need for a refurbishment solution that would restore aesthetics whilst extending the service life of the cladding system.

Replacing external cladding can be both costly and disruptive. PQ Corporation therefore sought a more cost-effective alternative that would deliver long-term performance without the expense and operational interruption associated with full replacement.

The Refurbishment Solution

Following a detailed survey and assessment of the building, Cladding Coatings Ltd recommended the installation of a specialist cladding coating system designed to provide long-lasting protection and exceptional visual improvement.

The project involved the refurbishment of two elevations of external cladding, along with all associated gutters and downspouts. Before any coatings were applied, the surfaces underwent thorough preparation to ensure optimal adhesion and system performance.

Key elements of the works included:

  • Comprehensive inspection and assessment of cladding surfaces.
  • Preparation and cleaning of all substrate areas.
  • Filling and repairing redundant holes and surface defects.
  • Surface preparation to create a stable foundation for coating application.
  • Application of a high-performance cladding coating system.
  • Coating of gutters and downspouts to achieve a consistent appearance.
  • Application of a fresh new blue finish across all refurbished elevations.
  • Installation of our manufacturer-backed 15-year warranty system.

By adopting a refurbishment approach rather than complete replacement, PQ Corporation was able to significantly reduce project costs whilst achieving a finish that delivered both aesthetic and protective benefits.

Project Delivery

Careful planning and coordination were essential to ensure the works could be carried out safely and efficiently within an operational industrial environment.

The Cladding Coatings team implemented a structured programme of works designed to minimise disruption to site activities while maintaining the highest standards of workmanship and health and safety compliance.

Surface preparation formed a critical stage of the project. All areas were cleaned and prepared to remove contaminants and provide a sound substrate for coating application. Existing holes and defects were professionally filled to create a smooth, uniform appearance before the coating system was installed.

Once preparation was complete, the specified coating system was applied across the two elevations and associated rainwater goods. The blue finish immediately transformed the appearance of the building, providing a modern and professional aesthetic while also delivering a durable protective barrier against environmental exposure.

The inclusion of gutters and downspouts within the scope ensured a fully integrated refurbishment, preventing visual inconsistencies and contributing to a cohesive, high-quality finish across the entire façade.

The Finished Results

The completed project successfully revitalised the external appearance of the PQ Corporation facility, providing a clean, modern finish that reflects the company’s professional standards and commitment to maintaining its assets.

Key project outcomes included:

Improved and Updated Appearance

The new blue coating system dramatically improved the visual impact of the building, creating a fresh and contemporary appearance that enhances both employee and visitor perceptions of the site.

Long-Term Protection

The specialist coating system provides a robust protective layer designed to withstand the challenges of the UK climate, helping to safeguard the cladding against future deterioration and extending its operational lifespan.

Cost-Effective Refurbishment

By choosing refurbishment over replacement, PQ Corporation achieved significant cost savings while still obtaining a high-quality result capable of delivering many years of reliable performance.

Improved Asset Value

Protecting and maintaining external building elements contributes to the long-term value of commercial and industrial assets. The completed refurbishment helps preserve the integrity and appearance of the facility for years to come.

Warranty-Backed Confidence

The installation of a 15-year warranty coating system provides peace of mind and confidence that the refurbishment will continue to perform as intended well into the future.

A successful Refurbishment in Warrington

The successful refurbishment at PQ Corporation, Bank Quay, Warrington demonstrates how a professionally applied cladding coating system can deliver outstanding results without the need for costly replacement works.

Through detailed preparation, expert repairs, and the application of a high-performance 15-year warranty coating system, Cladding Coatings Ltd transformed two elevations of external cladding along with associated gutters and downspouts. The striking blue finish has given the building a fresh new appearance while providing long-term protection against the elements.

This project highlights the value of cladding refurbishment as a cost-effective solution to improve aesthetics, extend asset lifespan, and maximise return on investment. By combining quality workmanship with proven coating technology, Cladding Coatings Ltd continues to help clients across the UK protect and enhance their commercial and industrial buildings for the long term.

Services Delivered:

  • Cladding refurbishment
  • Hole filling and surface repairs
  • Cladding coating installation
  • Gutter painting
  • Downspout coating
  • Industrial building refurbishment
  • 15-year warranty coating system
  • Commercial property asset protection
  • External façade improvement
  • Long-term corrosion protection