-
Nationwide coverage +44 (0)161 626 3493
-
Nationwide coverage +44 (0)161 626 3493
Case studies

Synertec, Warrington – Walls
The walls were re-coated to match the company branding and trims, doors and roller shutters were all matched to provide a fresh finish to the facade.

Synertec, Warrington – Roof
The roof refurbishment on this project required cut edge corrosion treatment, rooflight refurbishment and gutter lining.

Synertec, Warrington
This industrial unit required a full roof refurbishment and re-coating to the rear wall cladding, including roller shutter doors. Our new 30 year system was used on the roof.

Martin Collins Enterprises, Hungerford
A large metal clad unit showing signs of ageing and deterioration required a full external refurbishment.

Beechfield Brands, Bury
Cladding repairs were carried out to this property to cover holes and marks made by previously installed equipment.

Premier Automotive, Dukinfield
When cladding is aged, dirty and deteriorating, having the right treatment and restoration can transform any tired property.

DPD Unit, Warrington
Onsite cladding spraying was carried out on this industrial unit to freshen up the exterior and ensure it gave the right impression for the courier brand.

Holme Valley MRT, Marsden
Our teams worked safely on this mountain rescue teams head quarters in Holme Valley re-coating the roof and gutters of their facility.

MTS Limited, Bardon Hill
Cut edge corrosion treatment on the roof of two units was the priority to halt any damage, repair and treat the areas of concern preventing further deterioration of the sheets.

Former Poundstretcher, Leicester
A retail unit that required rebranding and refreshing due to a change of tennant. Work was carried out ot the roof and walls of this unit with a small amount of internal paint work.

The Fleets, Barnsley College
The roof of this college required cut edge corrosion treatment. Our expert team were able to carry out the repair work and leave the roof with an extended life span.

Coronation Rock, Blackpool
This production unit needed a refresh to the external walls and some work on failing guttering. We left site leaving the unit like new.

Car Supermarket, Birmingham
Onsite spraying at this car dealership included refurbishment of a canopy area and the re-coating of the external walls on the main building at the site.

QMC Hospital, Nottingham
This impressive transformation on this hospital treatment centre ran smoothly and without disruption to the services provided at the centre. The finish is very smart and appealing to visitors to the facility.

Former Halfords, Hull
This empty unit required a complete re-coat and rebranding ready for the new tenant. It needed to be made secure and work was carried out to roof, walls and internal areas.

Asda Trowbridge
This supermarket required a full, onsite metal wall coating refurbishment. We were able to deliver a fresh new finish on the building to ensure it looked like new again.

Industrial Units, Corby
A number of industrial units needed onsite spraying to refurbish the external wall cladding which had deteriorated and was showing signs of corrosion.

Econ Restaurants: McDonald’s, Accrington
This food outlet's roof and walls required cleaning and recoating to extend their lifetime and keep them looking cleaner for longer. Our unique Nano coating system was used on this project.

Hales Sawmills, Shropshire
A roof showing signs of age with flaking paint and corrosion, completely refurbished by our team. The roof has been repaired and re-coated onsite and has now extended its lifetime,

Lakes Build, Workington
This tired and faded industrial unit has been completely transformed into a bright and vibrant property thanks to expert on-site paint spraying from our highly experienced team.
Cladding Coatings Ltd
Latest article

Understanding Dirt and Algae Build‑Up on Metal Cladding
Metal cladding systems are engineered to provide durable, long‑lasting protection to commercial and industrial buildings. Yet even the highest‑performing coated steel or aluminium sheets are vulnerable to environmental contamination. Dirt accumulation, organic growth, and biofilm formation are common issues across…