  • Project: Lomond Plant Hire
  • Location: Liverpool
  • Building Type: Industrial Unit
  • Colour: Anthracite Grey & Yellow
  • Year: 2020

Lomond Plant Hire, Liverpool

We travelled to Liverpool for one of our latest projects, repairing and refurbishing the external building belonging to Lomond Plant Hire.

Lomond Plant Hire knew their property had problems. Areas of the cladding were showing signs of great wear, and the building needed a refresh for a clean finish that was on brand. Our team, led by Jon, headed to Liverpool to complete the work.

Replacing cladding when necessary

Sometimes, a building requires cladding replacement. Our aim is always to avoid this, as it is typically more expensive than cladding refurbishment. However, on occasion, our initial site survey at a client’s property will reveal cladding that’s condition means replacement is necessary.

To make our processes as smooth, efficient and hassle-free as possible, we can replace cladding where required as part of our project work. At Lomond Plant Hire, new cladding was fitted to the rear elevation. We were able to target the replacement to this one section of the building, keeping our client’s costs down and disruption levels low.

Varied paint systems to target key areas

Different areas of a façade require different treatment, so our team tailored their paint systems and application methods to meet the client’s needs.

On-site spraying was required for the front façade to repaint a wide area of the building’s cladding with an even and smooth finish. For masonry coating, brush and rolled paint application methods were used and the colour chosen was an anthracite grey to follow the cladding recoating paint colour on the front façade. Finally, the bollards and roller shutter doors were painted in a bright yellow for a splash of colour that also provided a bright and noticeable finish to aid health and safety.

Minimal disruption for professional results

Lomond Plant Hire’s project was completed in just one-to-two weeks. It’s a great example of the efficient way our team can work to make building refurbishment projects stress-free.

Naturally, you may be a little worried about the effect external works will have on your operations. Yet Lomond Plant Hire found that we encountered no problems on site and could complete the job with minimal impact on their day-to-day schedule. Asking our team to carry out external building refurbishment and repair was hassle-free and resulted in a safe, on-brand and professional façade finish they can be proud of.

Choosing how and when to refurbish your building can feel like a big decision. At Cladding Coatings, we make every external repair project as smooth and stress-free as possible leaving you to get on with running your business efficiently.

To discuss our well-practised methods and the professional finish we provide for your façade, get in touch with our team today. Our initial site visits are free of charge and we deliver our quotes with no obligation.

 

Cladding Coatings Ltd

  Unit 2A, Gatehead Business Park,
Delph New Road, Delph, Greater Manchester, OL3 5DE, UK
  +44 (0)161 626 3493, +44 (0)7961 798 799
  info@claddingcoatings.co.uk

Latest blog

Free site surveys: safe, secure and stress-free
27th November, 2020

We often talk about our free initial site surveys. We’re proud to deliver them: they give you the opportunity to meet our team, let us see your building first-hand, and […]

Read more