Carrington Power Station, Manchester

The front facade of this power station was deteriorating and peeling so it was re finished to improve appearance and provide long term protection.

Carrington Power is a key part of the region’s energy infrastructure, supporting sustainable generation and contributing to the wider transition towards lower‑carbon power. As part of their ongoing commitment to maintaining high standards across their facilities, the team at Carrington Power identified the need to refurbish the front elevation of their site.

The existing metal cladding had begun to show visible signs of ageing, with weathering, surface dulling and early‑stage degradation becoming increasingly apparent. Given the site’s prominence and the importance of maintaining a professional, well‑presented exterior, they sought a long‑term protective solution that would restore the façade and deliver reliable performance for years to come.

Cladding Coatings

Cladding Coatings were appointed to undertake the refurbishment of the front elevation, covering an area of approximately 210m². The client required a system that would not only improve the appearance of the building but also provide proven durability, resistance to environmental exposure and assurance through a robust warranty. Our 15‑year cladding coatings warranty system was selected as the ideal specification, offering a combination of aesthetic enhancement and long‑term protection backed by a manufacturer‑supported guarantee.

Before any coating work commenced, our team carried out a detailed site assessment to understand the condition of the existing substrate and identify any areas requiring additional preparation. The front elevation had been exposed to years of weathering, including UV exposure, rainfall, airborne pollutants and general industrial environmental conditions. Although structurally sound, the surface required a thorough cleaning and preparation process to ensure optimal adhesion and long‑term performance of the new coating system. This initial inspection also allowed us to plan access requirements and coordinate safe working practices around the operational site.

Surface preparation is a critical stage in any cladding refurbishment project, and at Carrington Power it was approached with the same meticulous attention to detail that underpins all our work. The elevation was cleaned using an appropriate method to remove contaminants, chalking, loose material and any residues that could compromise the coating system. Once cleaned, the substrate was inspected again to confirm readiness for coating application. Any minor imperfections were addressed to ensure a smooth and consistent finish across the full 210m² area.

Cladding Coatings
Cladding Coatings

With preparation complete, our specialist team applied the 15‑year cladding coatings warranty system. This high‑performance system is designed specifically for metal cladding refurbishment and provides exceptional resistance to corrosion, UV degradation and weathering. Its formulation ensures long‑term colour stability and surface integrity, making it an excellent choice for industrial and energy‑sector environments where reliability is essential. The coating was applied with precision to achieve a uniform, professional finish that immediately elevated the appearance of the building.

Throughout the project, careful attention was given to maintaining safe working practices and minimising disruption to the site. Carrington Power is an operational facility, and our team coordinated closely with the client to ensure that all work was carried out efficiently and safely. Access arrangements were managed to allow our operatives to work at height where required, while ensuring that the site remained fully functional. This collaborative approach ensured the project progressed smoothly from start to finish.

The completed refurbishment delivered a significant visual transformation. The front elevation now presents a clean, modern and well‑maintained appearance that reflects the professionalism of the organisation and the importance of the facility. Beyond aesthetics, the installation of the 15‑year warranty system provides Carrington Power with long‑term assurance that the cladding is protected against environmental exposure and ongoing wear. This reduces future maintenance requirements and supports the site’s commitment to maintaining high standards across its infrastructure.

Working with clients in the energy sector requires an understanding of the operational demands and safety considerations associated with these environments. Cladding Coatings has extensive experience delivering refurbishment projects across industrial and energy‑related sites, and this project at Carrington Power further demonstrates our capability to provide reliable, high‑quality solutions tailored to the needs of complex facilities. The successful completion of the front elevation refurbishment ensures that the building is protected, visually enhanced and supported by a long‑term warranty that offers peace of mind for years to come.

Contact our team for a free quotation if you are looking to refresh your facade.

Cladding Coatings Ltd

  • Address: Tanners Business Centre, Waterside Mill, Chew Valley Road, Greenfield, Oldham OL3 7NH
  • Phone: +44 (0)161 626 3493, +44 (0)7961 798 799
  • Email: info@claddingcoatings.co.uk

Latest article

Cladding Coatings

Professional Floor Coating in Modern Industrial Spaces

Across industrial estates, warehouses, and commercial production environments, the condition of the floor is often overlooked in favour of more visible elements such as cladding, roofing, or external façades. Yet the floor is one of the hardest‑working surfaces in any…