North West

Manchester
Project Re-Visit – Jofson

Ten Years on this building still looks great, a testiment to our high quality work and high performing paint systems


Read case study
Manchester
Think Hire

The roof and wall cladding on this building received a full refurbishment including the rooflights, gutters and cut edge corrosion treatment.


Read case study
Manchester
Granmore Ltd.

External maintenance and refurbishment work was carried out by the Cladding Coatings team on this property in Manchester to give the building a safe and secure finish.

Manchester
Burner Heating Spares Ltd

This retail unit required some external refurbishment to refresh the building exterior.

Manchester
Hadfield House
This 6,000m2 office and industrial unit based close to our office received a complete external refurbishment to its roof and walls.
Read case study
Blackpool
Jubilee Leisure Park

This busy seafront leisure park saw two buildings refurbished to repair corrosion, replace panels and refresh the overall façade.


Read case study
Blackpool
Coronation Rock

This production unit needed a refresh to the external walls and some work on failing guttering. We left site leaving the unit like new.


Read case study
Blackpool
Gilberts
The dull exterior was wearing away due to age and weathering, we provided a system to not only improve the look of the building, but prolong the life of the painted cladding, under our 10 year guarantee.
Read case study
Skipton
Britannia Willis
On-site spraying, external wall cladding and roof coatings, canopies, roof lights and roller doors re-painting to refurbish this building.
Read case study
Liverpool
Lomond Plant Hire
A professional refurbishment was required on this ageing cladding. A full external refurbishment was carried out to the metal cladding, brickwork and doors.
Read case study
Liverpool
Stonebridge East Industrial Estate
Onsite spraying was carried out to a number of units in Liverpool during 2017. St Modwen, landlords for the Stonebridge East (formerly Gilmoss) industrial estate, contacted Cladding Coatings as they wanted their recently vacated unit freshening up.
Read case study
Liverpool
Larch Lea Industrial Estate
The Larch Lea Industrial Estate in Liverpool had units in much need of maintenance and repair – our professional team were called into assist with their expert services.
Liverpool
St Modwen Developments Ltd
We used our on-site spraying services to transform the industrial units at St Modwen Developments, transforming their appearance.
Liverpool
Wynsors World of Shoes
Cleaning the external walls and roof before, spraying and paint colour matching to refurbish shopfront and maintain branding.
Read case study
Lancashire
Eccles Cake
With family values at the heart of the Cladding Coatings ethos, we were proud to be asked by family-run business Lancashire Eccles Cakes to conduct an external recoating of their site in Ardwick.
Read case study
Lancashire
Tuffnells Parcel Express
On site paint spraying of loading doors, fascia’s and metal cladding to change colour scheme to match company image and branding.
Read case study
Cheshire
Aquinas College
On site spraying of wooden cladding on external walls using the proven Sikkens system exterior two coat opaque painting system.
Read case study
Widnes
Metsa Wood, Widnes

Wooden cladding brought back to life thanks to a new coating system suitable for timber. The results are amazing and the external wooden cladding now has an extended lifespan.


Read case study
Widnes
Motorpoint
Shop front refurbishment and onsite spraying to redecorate building including cladding, guttering, windows, doors and canopy areas.
Read case study
Warrington
Golbourne Business Park

Several unit shopfronts at this enterprise park have been refurbished carefully to renew the doors and windows that were in need of updating.


Read case study
Warrington
Synertec

This industrial unit required a full roof refurbishment and re-coating to the rear wall cladding, including roller shutter doors. Our new 30 year system was used on the roof.


Read case study
Warrington
Plastic Closures Ltd

We used our tried and tested systems to refurbish the exterior of this industrial property.

Warrington
DPD

Onsite cladding spraying was carried out on this industrial unit to freshen up the exterior and ensure it gave the right impression for the courier brand.


Read case study
Warrington
Procurri Ltd
An industrial unit in need of re-coating due to age and deterioration to the metal wall cladding. The unit next door saw the transformation and booked in their project.
Read case study
Chester
McDonalds
The roof of the McDonalds restaurant in Chester was beginning to fade and look unsightly. Roof refurbishment services were carried out to match their new branding.
Read case study
Preston
Preston Muslim Girls High School

A roof replacement was required on this high school to improve performance, protection and aesthetics.


Read case study
Preston
Dee Gee International
This building has been transformed, from a tired and faded exterior to new, fresh and modern looking unit that oozes appeal. A digital mock up was carried out in advance to ensure the colour scheme worked with the building.
Read case study
Preston
FDC Refurbishment
Cladding Coatings used their on-site spraying service to revitalise the flaking warehouse unit, improving the overall appearance of the exterior.
Read case study
Stockport
Lancashire Hill Subway
After an underground subway in Stockport fell victim to graffiti, the inner walls of the tunnel were re-sprayed to remove the vandalism.
Read case study
Stockport
Shaw Heath Park
An outbuilding at Shaw Heath public park had been targeted by graffiti artists. With the help of Cladding Coatings the roof has been cleaned and painted to restore it to its former glory.
Read case study
Runcorn
Runcorn Industrial Estate
Cladding Coatings returned to an industrial estate in Runcorn, to continue refurbishment work on the external walls, doors and windows.
Read case study
Runcorn
GW Groundwork Services Ltd
Our expert team carried out their external refurbishment services at GW Groundwork Services in Runcorn.
Ulverston
Process Pipework Services
Three derelict workshops and a deteriorating office unit were in desperate need of external refurbishment.
Read case study
Wrightington
Sharrocks Ltd.
We recoated the exterior of this property to give it a polished and professional façade finish.
Read case study
Sandbach
Sharrocks Ltd.
Onsite spraying was carried out at this property to freshen up the exterior of the building leaving it looking like new again.
Read case study
Market Drayton
Hales Sawmills
A roof showing signs of age with flaking paint and corrosion, completely refurbished by our team. The roof has been repaired and re-coated onsite and has now extended its lifetime.
Read case study
Hyde
Premier Mitsubishi

A full re-spray of this car showroom’s external cladding improved its appearance and made it more inviting for customers. The build up of dirt and debris along with ageing cladding gave it the need for re-coating and refurbishment.


Read case study
Ashton-under-Lyne
Whitecroft Lighting Ltd.

Damage, fading, deterioration are common place on older industrial units. This one was no exception and it required external refurbishment to the metal cladding.


Read case study
Ashton-under-Lyne
Total Cricket
This retail unit needed the external walls refurbishing to give a polished façade that the client could be proud of.
Winsford
The Storage Team

A new building acquired by a repeat customer prompted them to contact us to change the colour scheme to match their branding.


Read case study
Winsford
Universal Mineral Supplies Ltd
Due to some damage and deterioration of the metal cladding wall sheets we re-coated this building to a high standard leaving it looking like new again.
Read case study
Birkenhead
Tipografic

A roofsafe inspection and certification was carried out to several buildings for this client.


Read case study
Birkenhead
The Hive, Wirral Youth Zone

This project for a community charity required flexible working to carry out the refurbishment whilst the building was still occupied and being used by youths. We were able to work around their requirements and deliver an amazing finish.


Read case study
Bury
Beechfield Brands

Cladding repairs were carried out to this property to cover holes and marks made by previously installed equipment.


Read case study
Workington
Lakes Build

This tired and faded industrial unit has been completely transformed into a bright and vibrant property thanks to expert on-site paint spraying from our highly experienced team.


Read case study
Dukinfield
Premier Autos

When cladding is aged, dirty and deteriorating, having the right treatment and restoration can transform any tired property.


Read case study
Blackburn
Bowker BMW

Appearance is vitally important at such a busy location, this car showroom needed to ensure it stood out for the right reasons. We used an impressive silver finish on the walls and canopy roof.


Read case study
Accrington
Econ Restaurants: McDonald’s

This food outlet’s roof and walls required cleaning and recoating to extend their lifetime and keep them looking cleaner for longer. Our unique Nano coating system was used on this project.


Read case study
Kirkby Lonsdale
Technijet

The Cladding Coatings team were required to refurbish and refresh the external façade on this industrial unit.

Prescot
Peoples Ford

After a full respray of the external cladding on this car showroom the building appears attractive to customers and looks brand new.


Read case study
Oldham
Precision Pallets & Cases Ltd

This industrial unit required onsite re-coating to the external metal cladding and roller shutter door. The radical transformation looks amazing.


Read case study
Bootle
Ford, Bootle

A refresh to the main entrance area of this car showroom left it looking inviting and attractive to customers.


Read case study
Bootle
Peoples Ford

Our team refurbished the external canopy on this car showroom to give it a fresh and appealing façade finish.

Leigh
Leigh Cables

The façade at this manufacturing facility needed some work to make it look nicer and to keep up the protection long term.


Read case study
Leigh
Unit D3 Moss Industrial Estate

Returning back to this industrial estate our teams were able to repair and refurbish this industrial unit’s roof to protect it long term for many more years.


Read case study
Leigh
Moss Industrial Estate

Several industrial units required refurbishment on this industrial estate. Solar panels also became a later addition onto the newly coated roof areas.


Read case study
Carlisle
Horn and Bauer, Cumbria

This building was showing signs of deterioration including peeling paint and cut edge corrosion. Our teams refinished the metal and made it look like a different building.


Read case study
Brampton
Horn & Bauer

This building was showing signs of deterioration including peeling paint and cut edge corrosion. Our teams refinished the metal and made it look like a different building.


Read case study
Wigan
MPV Packaging Ltd

Several metal wall cladding panels required refurbishing and repainting onsite to ensure this unit was maintained and protected.


Read case study
Saint Helens
Storage Team

The rebranding of this storage unit for this returning customer resulted in a stunning looking building that is modern and attractive to customers.


Read case study
Cumbria
Roxane UK Limited

This building elevation was showing signs of deterioration so we were able to recoat part of the buildings wall cladding to restore its condition.


Read case study
Northwich
The Window Exchange

This metal clad unit was faded and showing signs of deterioration. We re-coated all the external walls to make it look like new.


Read case study
Rochdale
Hanson Springs

The external cladding on this large manufacturing facility required refurbishment. Our teams carried out onsite spraying to update the aesthetics and protect it long term.


Read case study

North East

Darlington
Sports Direct
On-site shopfront spraying was carried out to the wall cladding and also spraying of the low level windows and doors.
Read case study
Leeds
Ring Automotive
This warehouse and office building was refinished to improve its appearance and to compliment the companies newer building nearby.
Read case study
Leeds
Renault Dacia Car Showroom
The newly acquired car showroom in Leeds required an external re-spray to coincide the facade with the new owners branding.
Read case study
Leeds
Elliott Hudson College
The newly occupied building for Elliott Hudson College was refurbished to match the branding at their current premises. The new unit was transformed using our expert on-site spraying services.
Read case study
Leeds
Tesla Car Showroom
The newly acquired showroom for Tesla required re-coating, with the external elevations needing to match the Tesla branding.
Read case study
Leeds
Wickes and Sports Direct
Retail units for Sports Direct and Wickes required refurbishment as part of a cost saving development programme for the units.
Read case study
Northumberland
Dutchwest Distribution
Wall cladding coating, onsite spraying was carried out on this building to refurbish the deteriorating external walls.
Read case study
Northumberland
Randstad Ltd
The internal industrial floor at Randstad was beginning to become worn, and tear. Cladding Coatings carried out their internal floor coating services to repair and protect the floor from footfall and heavy machinery.
Read case study
Northumberland
North Seaton Industrial Estate
The complete refurbishment of 5 warehouse units including all roofing & cladding repairs.
Read case study
Consett
Consett Industrial Unit
Due to weathering and ageing, the external façade and roof of the industrial unit at Consett was deteriorating rapidly.  Cladding Coatings used our trusted paint coating system, Noxyde to revitalise the failing building.
Read case study
Consett
Whittle Jones, Werdohl
Cladding Coatings were back on site at Werdohl Estate, as part of an annual maintenance plan that Whittle Jones has with us to ensure the upkeep of their buildings.
Read case study
Consett
Furgo Engineering Services
To protect and improve the appearance and condition of the metal cladding walls and roofing, painted with Rust-Oleum Noxyde.
Read case study
Bradford
Bulmer & Lumb
Our team revitalised the exterior façade of this manufacturing property in Bradford by refurbishing the external walls.
Bradford
Abundant Life Church
On-site spraying and painting of doors and windows was carried out to improve the appearance of this tired looking building.
Read case study
Whitley Bay
Proctor and Gamble
The repair and repainting of a large roof area for proctor and gamble has been carried out by our specialist coating team.
Read case study
Sunderland
Former IAC LTD. Site
This empty premises in Sunderland needed to be prepared for new tenants. The building owner knew that repairing any damage and a clean, polished finish was necessary before placing the property back on the market.
Read case study
Sunderland
Southwick Industrial Estate
Cladding Coatings revitalises the Whittle Jones industrial units to give them a new lease of life and improved image.
Read case study
Sunderland
Screwfix
Screwfix’s newly acquired premises required refurbishment and re-coating to bring it up to date and stand out from nearby competition. The Cladding Coatings team has recently completed a project for screwfix, a customer we have worked with on several other projects.
Read case study
Gateshead
Tripak
Tripak’s expansion and new warehouse site meant they required assistance from Cladding Coatings to refurbish the exterior and brand it.
Read case study
Batley
Pets Brand
Warehouse and office face lift for new facility of animal accessories and treats company, in time for opening.
Read case study
Hull
Car Supermarket

Another car showroom refurbishment for this famous brand. The colours, branding and professional finish to match their chain of stores.


Read case study
Hull
Former Halfords Unit

This empty unit required a complete re-coat and rebranding ready for the new tenant. It needed to be made secure and work was carried out to roof, walls and internal areas.


Read case study
Hull
Aldi Supermarket
With faded and unprotected cladding, cladding coatings refurbished the unit to prevent further permanent damage
Read case study
Whitby
Dennis Crooks Fish Merchants
Dennis Crooks Fish Merchants in Whitby has been subject to weathering and corrosion, the Cladding Coatings team were called in to re-coat, protect and beautify the facade of this unit.
Scunthorpe
Car Supermarket, Scunthorpe

A complete refurbishment was undertaken on this car showroom which included a full roof and wall cladding re-coating.


Read case study
Scunthorpe
Car Supermarket

External cladding coating was completed at this car showroom site to refresh its exterior.

Scunthorpe
Bibby Distribution
Refurbishment of a large 9,000m2 facade at a fully operating distribution facility. The cladding had deteriorated and required new brand colours.
Read case study
Wakefield
TrustFord
Ford’s Car showroom refurbishment project is now complete after a full external and internal re-coating.
Read case study
Blyth
Industrial Unit Refurbishment
The refurbishment of this empty unit in the North East, was carried out for one of our long standing customers, who as a landlord wanted to both maintain the property and rent it out quickly.
Read case study
Hessle
Car Supermarket
Our team were called in to recoat and refurbish the walls for our client Car Supermarket in Hessle.
Read case study
Cramlington
Nelson Park Industrial Estate
Wall refurbishment and wall cladding coating were completed at Nelson Park Industrial Estate by our team.
Houghton le Spring
Dubmire Industrial Estate
The team carried out some much-needed roof refurbishment work at the Dubmire Industrial Estate.
Barnsley
Siroflex Bostik Ltd

An amazing colourful transformation was carried out to this building as part of a complete wall cladding refurbishment.


Read case study
Barnsley
Retail Units

Roof, gutter and wall refurbishment was carried out to the shopfronts of several retail units on a busy retail park.


Read case study
Barnsley
The Fleets Barnsley College

The roof of this college required cut edge corrosion treatment. Our expert team were able to carry out the repair work and leave the roof with an extended life span.


Read case study
Hartlepool
Residential Property, Hartlepool

This residential property was in need of refurbishment to its existing metal cladding that was showing signs of corrosion. The cladding was professionally wrapped in film to protect and re-cover leaving a beautiful finish.


Read case study
Halifax
A-SAFE

An impressive example of how industrial metal wall cladding can be refurbished and re-coated to create a beautiful new facade.


Read case study
Huddersfield
Holme Valley MRT

Our teams worked safely on this mountain rescue teams head quarters in Holme Valley re-coating the roof and gutters of their facility.


Read case study
Grimsby
Car Supermarket

One of a number of projects completed for this car dealership where the careful onsite spraying of the exterior was required.


Read case study
Rotherham
Cetix Ltd.

A range of services and systems were used to refurbish the exterior of this building.

Knaresborough
The Pizza Oven Shop

A full refurbishment of the roof, walls, doors, windows and railings was carried out at this showroom, providing an outstanding external finish.


Read case study
Sheffield
Porcelanosa, Sheffield

A retail showroom, external wall refurbishment completed for returning customer. Recoated and ready for new signage fitting.


Read case study
Sheffield
RS Bruce

The external wall cladding required recoating and gutters needed refurbishment. Work was carried out to a high standard leaving an amazing finish to the facade.


Read case study
Castleford
AMG Systems

This external refurbishment included cladding repair and refurbishment to give the industrial building a smart and professional finish.

Boston
Mason Brothers, Boston

This storage and logistics facility was showing signs of deterioration. the walls have now been treated and recoated and are guaranteed to last.


Read case study
York
Storage Team

An acquisition of a property required a re-branding to the external wall cladding to be carried out on this storage unit.


Read case study
Doncaster
UK Greentech, Doncaster

This total roof refurbishment included cut edge corrosion treatment, rooflight refurbishment and gutter coating, producing amazing results.


Read case study

Midlands

Leicester
Former Poundstretcher

A retail unit that required rebranding and refreshing due to a change of tennant. Work was carried out on the roof and walls of this unit with a small amount of internal paint work.


Read case study
Leicester
Greenshires
Complete refurbishment and re-coating of the external metal cladding using a high performance coatings system.
Read case study
Birmingham
Car Supermarket

Onsite spraying at this car dealership included refurbishment of a canopy area and the re-coating of the external walls on the main building at the site.


Read case study
Birmingham
Chemique
Cladding fascia flaking repair at the early stage of deterioration. All fascia trim was recoated and matched to existing colours.
Read case study
Rugby
Toyvend Warehouse
This 20,000m2 warehouse refurbishment has transformed the facade of this premises after years of weathering and ageing.
Read case study
Rugby
Stepnell Unit
The roof and gutters at the building owned by Stepnell in Rugby required urgent attention. Two different gutter systems were used
Read case study
Nottingham
Vacant Unit – 7, Orchard Park Industrial Estate

The landlord of this vacant unit needed to update the look to make it attractive to new occupants. We refinished the metal wall cladding and updated the colour scheme.


Read case study
Nottingham
QMC Hospital

This impressive transformation on this hospital treatment centre ran smoothly and without disruption to the services provided at the centre. The finish is very smart and appealing to visitors to the facility.


Read case study
Nottingham
Porcelanosa, Nottingham
The third Porcelanosa shopfront to be completed by Cladding Coatings as part of their UK wide refurbishment programme.
Read case study
Nottinghamshire
Dukeries Academy
The existing college had buildings that did not match and were in need of re-coating. We helped with re-branding and re-coating.
Read case study
Stourbridge
Fox Moving & Storage Ltd
This storage warehouse in Stourbridge required re-spraying as the cladding on the top elevation had suffered from fading paint.
Read case study
Derby
Orbis
This building in Derby has been refurbished to look like new. Work on the windows, doors and external cladding brings the property up to date with a modern look.
Read case study
Kettering
Spark Angels
The exterior of this property needed some repair work. Our skilled team were able to carry out essential work on this unit and improve its overall appearance.
West Bromwich
West Brom FC
This large project not only needed a cladding re-spray but the gutters needed repair and re-coating. The project went well due to great team work and collaboration with our suppliers.
Read case study
Banbury
JS Fine Art

Internal and external refurbishment works were completed at this site to give the building a clean and professional finish.

Banbury
Ball Colegrave

We used our trusted coating systems to refurbish the walls and roof of this unit so that it matched the newer building on site.

Banbury
Cotefield Farm
Exterior wall refurbishment was completed to a high standard on this agricultural property.
Alfreton
Rotrex
This industrial property had full external wall refurbishment, including wall cladding coating which has completely transformed the exterior façade.
Read case study
Corby
Industrial Units
A number of industrial units needed onsite spraying to refurbish the external wall cladding which had deteriorated and was showing signs of corrosion.
Read case study
Coalville
MTS Logistics Ltd

Cut edge corrosion treatment on the roof of two units was the priority to halt any damage, repair and treat the areas of concern preventing further deterioration of the sheets.


Read case study
Coalville
DHL
This large 7,000m2 project saw an amazing transformation from a faded and dull exterior to a quality, modern and aesthetically pleasing finish. This matched the stong brand carried by the company.
Read case study
Buxton
Dowlow Quarry

Repair and refurbishment for these modular buildings was a unique project for our team but the results were outstanding.


Read case study
Buxton
Former Buxton Spring
Our team carried out external wall refurbishment on this industrial property to transform the exterior façade.
Read case study
Stoke-on-Trent
Car Supermarket

One of several car showrooms completed to compliment a rebrand, to update the colour scheme and refresh deteriorating cladding.


Read case study
Stoke-on-Trent
Tegiwa

This project was more than a straight forward re-spray, our team needed to use all their expertise to ensure that the refurbishment was completed to the highest quality and there was no disruption to the business operations.


Read case study
Chesterfield
Fusion Group

External refurbishment was completed at this industrial site, including recoating the windows and doors.


Read case study
Chesterfield
Roman Spas

An example of a complete re-brand in a new colour scheme on a commercial property that was also showing signs of deterioration and required coating to the wall cladding.


Read case study
Royal Leamington Spa
Urban Sports

This commercial building required external cladding refurbishment and wall cladding coating to refresh its exterior.

Royal Leamington Spa
Renault Car Showroom

Our team refurbished loading doors and an external column at this car showroom site to refresh its appearance.

Hinkley
Hammonds Furniture, Hinckley

Two units at this manufacturing facility and headquarters building were refreshed to update the metal clad facade and create a modern and stylish look.


Read case study
Northampton
DX Freight

A re-branding refinish was required at this logistics facility. A change of colour scheme was carried out to the external metal cladding.


Read case study
Loughborough
West Park Teaching Hub

Transforming the deteriorating paintwork at this university campus has transformed this learning facility into a stylish and inviting place to study.


Read case study

Scotland

Aberdeen
Parcelforce
Cut edge corrosion was found on the sheet ends. We repaired and protected the cladding against further deterioration.
Read case study
Hamilton
Chiquitos
The former restaurant was empty and needed to attract a new tenant. The exterior was re-coated to give it an attractive finish.
Read case study
Kirkcaldy
Kirkcaldy Leisure Centre

Due to the nature of this project, it required cut edge corrosion treatment and wall cladding coating to restore the facade and protect it long term.


Read case study
Livingston
Millipore UK Ltd – Merck

The tired, faded and ageing cladding on this centre of excellence required our services to uplift the façade.


Read case study

South East

Horsham
SOS Communications
The exterior of SOS Communications was deteriorating and required refurbishment. We were able to re-coat the building.
Read case study
Littlehampton
The Littlehampton Academy Sports Hall
A site inspection was carried out to check the condition of the roof. Attention was given to the following; gutters, 12 roof lights, roof sheets, fixings & the ridge detail.
Read case study
Berkshire
Greengate Mechanical Services Ltd.

This roof refurbishment project saw a deteriorating and flaking roof surface transform into a protected, long lasting fully refurbished roof.


Read case study
Berkshire
Aircraft Hanger
Roof and external wall cladding refurbishment due to weathering, project included cut edge corrosion repair using tor Elastaseal.
Read case study
Watford
National Distribution Centre
Improve external building’s décor, industrial painting all windows, doors and fascia’s to make more appealing and attractive to tenants.
Read case study
Hertford
Office Refurbishment
Refurbishment of doors, windows, frames and panels, painting and powder coating aluminium windows, doors and frames.
Read case study
Hertford
Office Refurbishment
Office refurbishment project, onsite spraying of the external facade was required to improve rental potential of this vacant building.
Read case study
Gloucester
Arthur Spriggs
Cladding Coatings is delighted to have recently completed a project for new client Arthur Spriggs & Sons carrying out the external refurbishment of their industrial unit.
Read case study
Gloucester
BL Flooring
New location for flooring company required refurbishment and improvement of its appearance to attract more customers.
Read case study
Ashford
Keel Toys
This vast 115,000sq ft warehouse has seen a complete refurbishment of its external cladding, windows and doors. Using digital visualisation to help select the best coating, an amazing finish was achieved, leaving the client delighted.
Read case study
Chelmsford
Tattersall Way
The owner of this property was looking to tidy it up and update its exterior as it was due to be put on the market for sale. The transformation is amazing and makes the building attractive to buyers.
Read case study
Canterbury
Wincheap Retail Park

The roof of a unit on a busy retail park required extensive refurbishment to ensure it was protected and looking good.


Read case study
Canterbury
Pure Gym
After this premises was showing signs of corrosion it has undergone a complete external refurbishment and repair to ensure its looking attractive to its customers.
Read case study
Alton
Augustus Oils

This grand looking building saw our team give it a makeover to restore the façade to its former glory. Our work included the cladding, columns, canopy and flooring.


Read case study
Hemel Hempstead
Expo Team

This industrial unit’s external facade was sprayed onsite by our team to provide a refreshed look. The external walls are now protected for years to come.


Read case study
Reading
Car Showroom

External wall cladding coating was carried out at this luxury car dealership along with onsite spraying work to the external fences around the perimeter.


Read case study
Aylesham
Intex House

A project consisting of several building areas featuring different cladding materials. The cladding refurbishment to all the external walls was completed to leave a professional looking finish.


Read case study
Bury St Edmunds
Rawlinson Automotive, Bury St Edmunds

A car showroom with solar panels to the roof required a full roof refurbishment and repair. Our teams delivered a high quality finish ready to receive the solar panels.


Read case study
Letchworth
Norton Way Peugeot, Letchworth

The metal cladding panels were peeling and deteriorating so required a full respray to the external walls leaving this car showroom looking attractive to customers.


Read case study
Huntingdon
R.D.Williams & Sons (Haulage) Ltd

New colour and new finish applied to this distribution facility to refresh the exterior and improve its aesthetics.


Read case study
Great Yarmouth
ASDA

A refurbishment to the metal cladding panels at this Asda Supermarket left the store looking amazing.


Read case study

South West

Trowbridge
Asda
This supermarket required a full, onsite metal wall coating refurbishment. We were able to deliver a fresh new finish on the building to ensure it looked like new again.
Read case study
Gloucester
Tricel
Our team got to work to refurbish the exterior walls on this industrial property.
Swindon
Howard Tenens, Groundwell, Swindon

A full refurbishment was carried out to the roof and walls of this large logistics and warehouse facility including the addition of solar to the roof.


Read case study
Swindon
Howard Tenens
Cladding coating was required for our logistics company client on this project, and we helped them update their premises and change the colour scheme with the support of our valuable digital mock up service.
Read case study
Cinderford
Fox Bridges Road
Our team carried out refurbishment work on this property in Cinderford.
Andover
Howard Tenens

We recoated the exterior cladding on this warehouse unit with minimal disruption to our client’s daily business operations.


Read case study
Hungerford
Martin Collins Enterprises

A large metal clad unit showing signs of ageing and deterioration required a full external refurbishment.


Read case study
Sharpness
Howard Tenens

This large logistics facility benefitted from a full external wall cladding refurbishment. This site was one of three for this client that have now been refreshed.


Read case study
Wimborne
Energy Network Services

Cladding Coatings completed external wall and roof refurbishment on this project to refresh the building’s exterior.

Bodmin
DX

An extensive refurbishment to the roof and wall cladding of this large unit included rooflight, gutter and metal cladding refurbishment.


Read case study
Ivy Bridge
Bandvulc, Ivybridge, Devon

This world class manufacturing facility now has external metal cladding to match. A full onsite respray was carried out to this property in Devon.


Read case study
Bridgwater
Squab Storage

This storage unit in Bridgwater was rebranding and updating its facilities to reflect its secure and professional image.


Read case study
Bristol
Synertec

A second unit refurbishment for this company to provide a 30 year guarantee resulted in a stunning high quality finish.


Read case study

Wales

Cardiff
Porcelanosa, Cardiff
The high street brand, Porcelanosa is in the process of updating its stores accross the UK. Cladding Coatings is assisting them using their extensive expertise and experience to achieve the new look they are seeking.
Read case study
Conwy
Deane’s Removals
Storage facilities hold lots of items within their walls and need to withstand the weather and offer a safe and secure, well maintained accommodation for these. This storage facility was refurbished both to offer protection to the goods within but also to look appealing to customers.
Read case study
Wrexham
JCB Transmissions

This unit required some refinishing work to bring the exterior up to its best. We provided a premium finish for this well known brand.


Read case study
Wrexham
Brother, Wrexham (Flooring)

A returning customer needed our services to repaint the internal flooring in the factory. The new bright finish helps to improve safety and cleanliness.


Read case study
Wrexham
Brother Industries UK LTD

Not only did the cladding and canopy area require coating on this project but we also painted the plant equipment on site. The freshly painted machinery, metal work and cladding makes a huge impact on the appearance.


Read case study
Cwmbran
Televes

This building located in Wales was ageing and had started to deteriorate. It required a full re-coating to the external façade to bring the colours back to life and protect the cladding for years to come.


Read case study
Swansea
Swansea Railway Station

Existing copper cladding at this railway station required re-coating to leave a fresh, clean and modern finish. The paint colour chosen brightened up the ticket office and retail fronts.


Read case study
Menai Bridge
Pentraeth Automotive

External refurbishment was required at this car showroom site to make it look smart and appealing to customers.


Read case study

Killarney

Great Yarmouth

Cladding Coatings Ltd

  • Address: Tanners Business Centre, Waterside Mill, Chew Valley Road, Greenfield, Oldham OL3 7NH
  • Phone: +44 (0)161 626 3493, +44 (0)7961 798 799
  • Email: info@claddingcoatings.co.uk

Latest article